The numbers, and what moves them.

A capacity figure is only useful with its conditions attached. These are ours, stated for standard reinforced concrete. Tell us your reinforcement, aggregate and access and we will restate them for your job in writing.

Why we publish these. Every competitor in this category advertises “no limits,” “any depth,” “unlimited diameter.” None of it is verifiable and none of it helps you qualify a vendor. A real number with a real constraint attached is worth more than a superlative, so that is what we put on the website.
Method
Single pass
Engineered
Access we need
Power
Water & slurry
Wall sawing
24″
40″
Track line plus 36″ working side. Both faces past 26″.
480V 3φ / hyd.
Wet. Vacuum recovery, filtered discharge.
Slab & flat sawing
24″
36″
Walk-behind envelope, 30″ min. aisle.
Diesel / elec.
Wet standard. Dry-cut with HEPA where discharge is prohibited.
Wire sawing
Governed by geometry
Section size
Drive-side 18″ plus a wire return path. Both required.
480V 3φ
Wet. Enclosure and catchment for occupied spaces.
Core drilling
½″–60″
96″
Anchor or vacuum base. Overhead cores need fall-arrest tie-off.
120V / 480V
Wet. Ring dams and wet-vac on finished floors.
Deep coring
30 ft
100 ft+
Staging for tubing string and cuttings handling.
Rig-mounted
Circulated; cuttings separated and drummed.
Hand & chain sawing
12″/17″
Anywhere an operator fits. Confined-space permit if applicable.
Hyd. / gas
Wet. Minimal volume.
Robotic breaking
Remote & hand
Confined / overhead
Remote operation; no operator in the hazard zone.
480V 3φ
Dust suppression only.

What we will not claim

We don’t advertise unlimited depth, unlimited diameter, or a fleet size. Depth is bounded by blade radius, machine reach and access, and every one of those is a number we can give you. Where a competitor writes “any depth,” we write the depth.

Silica, noise and occupied buildings

Wet cutting and HEPA recovery keep us inside OSHA Table 1 for respirable crystalline silica without a separate exposure assessment. For hospitals, labs and live data halls we submit a noise and vibration plan with the method, not after the first complaint.